Mullewa WA trials

0 results found (Displaying 1 - 1)
Trial Contributor
Funding sources
Year Trial site
Time to lime trial 96GE8 – Alan Desmond (now Tim Critch) Mullewa

In the mid 1990’s, DAFWA established a series of lime demonstrations sites across the WA wheatbelt, to highlight the importance of managing soil acidity. This trial is one of the series, which had a very simple design (0, 1 and 2t/ha applied, in 3 replicates). The rationale was to use farmer equipment, to enable larger areas to be treated differently, and ultimately provide extension opportunities across the WA wheatbelt.

Liebe Group
GRDC
2015 Mullewa WA
Research organisaton